Abstract
FEMP case study overview of the geothermal/ground source heat pump project at the U.S. Army Fort Knox Disney Barracks.
Original language | American English |
---|---|
Number of pages | 2 |
State | Published - 2010 |
NREL Publication Number
- NREL/FS-6A4-46349
Other Report Number
- DOE/GO-102010-2911
Keywords
- case study
- Disney Barracks
- DOE
- Federal Energy Management Program
- FEMP
- FEMP
- Fort Knox
- geothermal
- geothermal ground source heat pumps (GHP)
- renewable energy (RE)
- U.S. Army
- U.S. Department of Energy