Validation of IEEE P1547.1 Interconnection Test Procedures: ASCO 7000 Soft Load Transfer System

Research output: NRELTechnical Report

Abstract

This report presents the preliminary results of testing the ASCO 7000 Soft Load Transfer System according to IEEE P1547.1 procedures. The ASCO system interconnects synchronous generators with the electric power system and provides monitoring and control for the generator and grid connection through extensive protective functions. The purpose of this testing is to evaluate and give feedback on thecontents of IEEE Draft Standard P1547.1 Conformance Tests Procedures for Equipment Interconnecting Distributed Resources With Electric Power Systems.
Original languageAmerican English
Number of pages52
DOIs
StatePublished - 2003

NREL Publication Number

  • NREL/TP-560-34870

Keywords

  • anti-islanding
  • D
  • DER
  • DG
  • distributed energy resources (DER)
  • distributed energy resources test facility
  • distributed generation
  • distributed power
  • distribution and interconnection R&amp
  • DP
  • IEEE 1547
  • IEEE P1547.1
  • International Electrical and Electronics Engineers (IEEE)
  • islanding
  • National Renewable Energy Laboratory (NREL)
  • NREL
  • standards
  • testing

Fingerprint

Dive into the research topics of 'Validation of IEEE P1547.1 Interconnection Test Procedures: ASCO 7000 Soft Load Transfer System'. Together they form a unique fingerprint.

Cite this